Planning, Estimating and Technical Auditing
On this page 4 headings
Start here How much water did yesterday’s rain bring to Chennai? You don’t need a satellite. Put a tub on your terrace, measure the water in it, and multiply by the area of the city. That’s engineering sense: a quick, smart estimate.
Habit 1: Planning
Planning = arranging what tasks to do, how to do them, and how to use resources well, to reach a goal safely, effectively and efficiently, in the right proportions and within a time limit.
The word “engineer” comes from the Latin ingenium (cleverness). In old English, an “engine” could also mean a clever plan or plot, so planning sits at the very root of engineering.
Lecture example — building a table Even for a simple table, you plan:
- Materials: wooden planks, legs, nails, paint, in the right quantity.
- Tools: which tools; do I have them or must I get them?
- Place: where will I build it?
- Transport: how will I bring the materials?
Lecture example — Prof. Kartic: planning a large IT account When Prof. Kartic took charge of a large account, the first 3–6 months felt like chaos. There were client work, internal teams (delivery excellence, innovation), escalations and staff leaving. His planning steps:
- Document everything and spot the patterns of work.
- Decide who is best at what.
- Give extra roles to small teams, not single “stars”, so work doesn’t stop if one person is away (de-risking).
- Set up monitoring: regular meetings to track progress.
“Your plan may fail, but do not fail to plan.” Keep a plan B and a plan C.
Use the right tools: you could turn a screw with a spoon, but a screwdriver is the right tool. Prof. Kartic first built games from scratch, then switched to platforms with ready templates (like crossword templates), which made the work much faster.
Habit 2: Approximating and estimating
Engineers want a quick ballpark figure: a number that is close enough to be useful.
Lecture example — the room A cube-shaped room measures 2.05 m on each side.
- Quick estimate: 2 × 2 × 2 = 8 m³.
- More precise: 2.05 × 2.05 × 2.05 ≈ 8.6 m³. The quick 8 m³ is often good enough to decide things fast. (Note: in the video the lecturer adds only 0.15 and gets 8.15 m³. The correct value is about 8.6 m³.)
Lecture example — the rain in Chennai Put a tub outside during rain. Next day, the water is 3 cm deep. So the rainfall was about 3 cm. Water received ≈ 3 cm × area of Chennai. That gives a useful estimate.
Another example: after demonetisation, a friend asked how many rupees change hands in India each day. Look at one part of a city, then extrapolate.
Habit 3: Technical auditing: “What is conserved?”
Technical auditing means checking what should balance, and asking where the difference went. It is based on conservation: some quantities (energy, mass, money, people) can’t just disappear.
Lecture example — the bouncing ball Drop a ball from 2 m. It bounces back lower. Energy is conserved, so where did the rest go? It became heat, sound and friction at impact.
Lecture example — cement + sand 1 bag of cement + 1 bag of sand ≠ 2 bags of mix. Some cement fills the gaps between sand grains, so the volume is less. But the weight is the same, because weight is what’s conserved.
Lecture example — hostel rooms and mess food As Dean, Prof. Sivakumar used auditing for hostel occupancy: the number of rooms is fixed, so the count must balance. With Lt Col Jayakumar, he audited mess food waste: how much was cooked, served, eaten and wasted. Plate waste went to a biogas plant; unserved food went to NGOs.
Lecture example — army operations (Lt Col Jayakumar) Every day is an audit. For road opening and convoy protection, the cook has tea ready at 4 a.m., the armoury opens, weapons are checked, vehicles are ready by 5:15, and the road is declared clear by 7 a.m. For an attack “by 0500 hours”, the commander works backwards: resources (own and borrowed), who does what, transport and fuel, ammunition (and when reserves may be used), time, and environment (moonlight, rain). Afterwards: count the people and the stores. Training + maintenance + inventory control keep a unit “fit for war at all times”.
In one line: Plan what, how and with which resources; make quick ballpark estimates; and audit what should be conserved to find where things went. Exam words: planning, resources, de-risking, monitoring, “don’t fail to plan”, right tools, approximation, estimation, ballpark figure, extrapolate, technical auditing, conservation, debriefing.